House Progress Summer 2005
•
(L) Here is our lot compared to Mom’s (R) Our lot before
building

(L) This is the topsoil cleared with our view. WOW! (R) Jeff riding his
motorcycle. That pile sure makes a good jump… NOT!
(L) Jeff saved these Killdeer eggs from the lot (R) Jeff
talking to the track hoe operator

(L) This is MK operating the track hoe!! (R)And Jeff too!!!

(L) Jeff, Craig and Dale building forms (R) Almost
done! (with the forms that is)

(L) Gravel being poured into the forms (R) The
footings poured
(L) These are the forms for the foundation (R)
This is the foundation poured!
(L) This is our walkout basement (R) Here are the
window wells that we built
(L) The lumber for framing (R) Both of us were gone for
a week and when Jeff got back, this wall was up!
(L) The floor was built
too (R) The basement
basic frame
(L) The outside walls being framed (R) From the
inside
(L) The whole house is framed! (R) From the back (shows
the walkout basement)
(L) Here is the front entryway, the
library (R) This is looking down the hallwayand laundry room in the
corner
from the great room. Master bedroom
on
the left, bathroom straight ahead, other two bedrooms
on the right.
(L) The kitchen (R) The breakfast nook and back doors